lays strong focus on process quality to meet customer
requirements consistently. This is done through
a strong, flexible and continuously improving
Quality Management System (QMS). The QMS has evolved
over a period of many years, and is compliant
with ISO 9001 standards.
Once ii takes up a project,
the work starts with a project commencement meeting
where all team members of the project, representatives
of the support departments, and the quality coordinators
participate. They determine the customer requirements
and commit themselves to the success of the project.
The project manager carries out a detailed estimation
of size, effort and resources by referring to
the process database. Based on all these inputs,
the project manager prepares a project management
plan as per the tailored QMS template. The project
manager also plans for the relevant metrics and
the organizational baseline (upper and lower boundary
of the metrics). He/She sets the metrics target
for the project based on QMS procedure.
Every project is assigned
to a Software Quality Assurance Engineer (SQA)
who monitors the process and product quality of
the project. He/She reports the progress on this
front to the project manager and to the core quality
team. The status of the project is monitored by
the senior management at periodic intervals as
well as by the customers, through pre-defined
conference calls. The SQA performs an independent
sample test of all deliverables to ensure compliance
to the requirements before despatching them to
the customers.
When the project is completed
and all deliverables have been handed over to
the customer, a project windup meeting is conducted
to systematically analyze the project learning.
The output is fed back into the process database
for future reference.
ii is ISO 9001 certified and
this provides the basic process discipline to
all our Software Development Cycles, enabling
us to provide on-time delivery.
|